B. N. A. CUBE

Pages

  • Updates
  • About Us
  • Video
  • Project
  • OJT

Friday, 15 June 2012

Warehouse Plan

Today, we went to NFA to get the warehouse plan we requested from them. After that, we headed right away to Matalino St., near East Ave., to get the plan photocopied. 




Posted by Unknown at 22:37
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Building North Construction

Building North Construction

Recent Posts

  • Design of Purlins (DL + LL Load Combination) Calculation Sheet
  • Design of Side Girts (DL + WL Load Combination) Calculation Sheet
  • Wind Load (Analytical Procedure) Excel Program
  • Wind Load (Simplified Procedure) Calculation Sheet
  • Architectural and Structural Plans
  • Design of Purlins (DL + WL Load Combination) Calculation Sheet
  • Truss: Manual Computation (DL + LL Combination)
  • Wind Load (Analytical Procedure) Calculation Sheet
  • Brainstorming
  • Wind Load (Simplified Procedure) Excel Program

Affiliates

  • Al Jajaj
  • Back Steel Boys Construction
  • BMPC Design & Construction
  • Delapapero Corporate
  • Earth + Steel Construction
  • Hardhots
  • MJ Associates & Co.
  • Precipice
  • Scene Steeler
  • Steel The One Inc.
  • V-Real

Blog Archive

  • September (9)
  • August (2)
  • July (4)
  • June (5)
Travel theme. Powered by Blogger.