B. N. A. CUBE

Pages

  • Updates
  • About Us
  • Video
  • Project
  • OJT

Project

FINAL drawings and calculations will be put in this page.

For the meantime, drawings and calculations already made are posted in the Updates page. See Recent Posts for latest updates.


Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Home
Subscribe to: Posts (Atom)

Building North Construction

Building North Construction

Recent Posts

  • Design of Purlins (DL + LL Load Combination) Calculation Sheet
  • Design of Side Girts (DL + WL Load Combination) Calculation Sheet
  • Wind Load (Analytical Procedure) Excel Program
  • Wind Load (Simplified Procedure) Calculation Sheet
  • Architectural and Structural Plans
  • Design of Purlins (DL + WL Load Combination) Calculation Sheet
  • Truss: Manual Computation (DL + LL Combination)
  • Wind Load (Analytical Procedure) Calculation Sheet
  • Brainstorming
  • Wind Load (Simplified Procedure) Excel Program

Affiliates

  • Al Jajaj
  • Back Steel Boys Construction
  • BMPC Design & Construction
  • Delapapero Corporate
  • Earth + Steel Construction
  • Hardhots
  • MJ Associates & Co.
  • Precipice
  • Scene Steeler
  • Steel The One Inc.
  • V-Real

Blog Archive

  • September (9)
  • August (2)
  • July (4)
  • June (5)
Travel theme. Powered by Blogger.